PURCHASER:
MALE HIDRE d.o.o.

TYPE OF DOCUMENTATION:
Final Design

DESCRIPTION:
The Otočac Small Hydroelectric Power Plant (HPP), installed capacity 1.8 MW, is planned to be built near the City of Otočac, Lika-Senj County, on the Lika-Gacka connecting canal, which is a part of the larger Senj Hydropower System (Senj HPS).
 
It is planned that the water that now passes through the Lika-Gacka tunnel and connecting canal  be harnessed for power generation on the connecting canal reach between the tunnel exit and the canal mouth into the Gacka River (Karlov Kanal canal on the Gacka) where the gross head is 5 meters.



 
elektroprojekt d.d.
Alexandera von Humboldta 4
10000 Zagreb
tel: +385 (01) 6307 777
CONTACT US