PURCHASER:
JP ELEKTROPRIVREDA HZ HERCEG BOSNE d.d., Bosnia and Herzegovina

TYPE OF DOCUMENTATION:
Final Design, Detailed Design, As-built Design

DESCRIPTION:
The Mostarsko Blato Hydroelectric Power Plant (HPP) power system is located near the City of Mostar, Bosnia and Herzegovina, and the system comprises the following:
 
  • Training of the Lištica River and associated tributaries, length about 8 km2 
  • Mostarsko Blato reservoir, active storage approx. 1,000,000.00 m3
  • Headrace tunnel with intake structure and surge chamber (tunnel dia. 4.2 m, length 2,250 m)
  • Penstock, dia. 3.0 m, length 375 m
  • Powerhouse with two Francis turbines (Qi=2x20.0 m3/s, P=2x32 MW)
  • Tailwater compensation basin
  • Tailrace canal-tunnel
  • Access roads