PURCHASER:
Hrvatske Vode

TYPE OF DOCUMENTATION:
Final Designs, Detailed Design of outlet structures

DESCRIPTION:
The Burnjak retention basin regulates the water waves of the Burnjak stream, a tributary of the Toplica River, in the Krapina River basin, in order to protect Stubičke Toplice municipality from flooding. The retention basin development includes the construction of outlet structures, an embankment dam, a monitoring system and the water supply pumping station protection.
elektroprojekt d.d.
Alexandera von Humboldta 4
10000 Zagreb
tel: +385 (01) 6307 777
CONTACT US