PURCHASER:
Voda Garešnica d.o.o.
TYPE OF DOCUMENTATION:
Feasibility Study, Environmental Impact Studies, Conceptual Design, Final Design, Tender documentation (for construction of the sewerage system, WWTP, supervision and equipment)
DESCRIPTION:
The construction of a gravity and pressure collector network is planned in the Garešnica and Hercegovac agglomeration, 14,545 m and 10,183 m in the Garešnica and of Hercegovac area, respectively, along with the construction of a wastewater treatment plant (10,000 PE). The reconstruction of the existing 5,749 m gravity collector network in the area of Garešnica is also planned.
The Feasibility Study, the application of the water utility infrastructure for co-financing from EU funds, as well as the Environmental Impact Studies, Conceptual and Final Designs were prepared.
Voda Garešnica d.o.o.
TYPE OF DOCUMENTATION:
Feasibility Study, Environmental Impact Studies, Conceptual Design, Final Design, Tender documentation (for construction of the sewerage system, WWTP, supervision and equipment)
DESCRIPTION:
The construction of a gravity and pressure collector network is planned in the Garešnica and Hercegovac agglomeration, 14,545 m and 10,183 m in the Garešnica and of Hercegovac area, respectively, along with the construction of a wastewater treatment plant (10,000 PE). The reconstruction of the existing 5,749 m gravity collector network in the area of Garešnica is also planned.
The Feasibility Study, the application of the water utility infrastructure for co-financing from EU funds, as well as the Environmental Impact Studies, Conceptual and Final Designs were prepared.