CLIENT:
HEP-Operator distribucijskog sustava d.o.o.

TYPE OF DOCUMENTATION:
Main Design

DESCRIPTION:
Development of the main design for the 110/10(20) kV Zamet Substation, which includes 110 kV switchyard and 20 kV switchgear, associated AC and DC Motor Control Centres, monitoring, control, measurement and protection, and grounding, lightning protection and outdoor lighting of the facility.
The design also included all civil and architectural parts of the facility related to the construction of the substation building and the surrounding platform with drainage and roads, as well as electronics, technical protection, fire alert system and telecommunications.


elektroprojekt d.d.
Alexandera von Humboldta 4
10000 Zagreb
tel: +385 (01) 6307 777
CONTACT US